Lyžiarske stredisko – Pezinská Baba

ATTENTION! Transferred operation of the VL1000 lift to 28.9.2024 is cancelled.

ATTENTION! Transferred operation of the VL1000 lift to 28.9.2024 is canceled due to ongoing mining. The next scheduled operation will be 12.10.2024.

Exit mobile version